This type of machine under finished product line has high quality, smooth surface and thickness Evenly, which take good cooling system, water cooling and air cooling, good quality high reliability, low shutdown. This type of machine uses PLC+ frequency conversion speed regulation, convenient operation.
Machine performance:
Structure includes hydraulic pay-off, brushes descaler, main blocks, hydraulic take-up machine. Detail pat can be design and require by your detail need.
Advantage :
1.Water cooling reduces the heat generated in the drawing process and reduces Mold loss, improve wire quality.
2.high quality of finished line, smooth surface, thickness uniform.
3.Tungsten carbide spray the drums, long service life
4.High speed with inverter speed adjustable
Machine parameters
Model | LSJ9-800 | LSJ9-700 | LSJ9-600 | LSJ9-400 |
Drum Dia./mm | 650 | 550 | 500 | 400 |
Drawing Passes/time | ≤12 | ≤12 | ≤12 | ≤14 |
Max. Inlet Wire Dia./mm | 8 | 8 | 6.5 | 3.8 |
Min. Outlet Wire Dia./mm | 1.8 | 1.8 | 1.8 | 0.75 |
Drawing Speed/ m/min | Max 12 | Max 12 | Max 12 | Max 15 |
Inlet Wire Strength/kg/mm2 | ≤1300 | ≤1300 | ≤1300 | ≤1300 |
Motor Power/kW | 30-65 | 22-30 | 18.5-22 | 11-15 |
Remark | We Can Customize According to Different Requirements of User | |||
01
Requirement Communication
We discussed the detaills for customer’s requirements including product specifications, functions, etc.
02
Scheme Design
According to customer needs, the company's design department provides a preliminary design plan and confirms it with the customer.
03
Technical Evaluation
The technical team conducts a feasibility evaluation of the plan to ensure that it meets production requirements and customer needs.
04
Contract Signing
After the two parties reach a consensus on the design plan, price, delivery date, etc., they sign a formal contract.
05
Manufacturing
The production department customizes the equipment according to the contract requirements to ensure quality and performance.
06
Quality Inspection
The quality inspection department conducts strict debugging and inspection of the finished equipment to ensure that it meets customer requirements.
07
Delivery Acceptance
After the customer's on-site/video debugging and acceptance is qualified, the product will be delivered and relevant operation guidance will be provided.
Related Products